Where We Fit
Cleaning Support Across the Construction Lifecycle
LD Turnover supports construction projects at key cleaning stages from active building through final handoff.
The Details
What Each Service Includes
Select a service for the full scope and when it typically happens.
Rough CleaningAfter rough-in work is substantially complete, before finish trades begin.
What It Includes
The initial construction-cleaning pass. It removes manageable debris, packaging, heavy dust, and construction residue so work areas are cleaner and better prepared for the next stages of construction.
- Gathering, bagging, and consolidating manageable construction debris
- Placing debris in the GC’s or project’s existing dumpster or designated disposal area
- Removing heavy dust and loose construction residue
- Sweeping and vacuuming
- Cleaning accessible surfaces
- Resetting work areas for continued construction
Does not include bulk demolition hauling or independent dumpster service.
Final CleaningAs construction and finish work near completion, before walkthrough, inspection, or handoff.
What It Includes
The detailed post-construction clean performed as construction and finish work near completion. It prepares the space for walkthroughs, inspections, presentation, occupancy, and handoff.
- Fine-dust removal
- Floors
- Baseboards and trim
- Doors and frames
- Fixtures
- Cabinetry exteriors
- Reachable glass
- Window tracks and sills
- Restrooms
- Kitchens and break areas where applicable
- Fingerprints, labels, smudges, and ordinary construction residue
Paint, adhesive, caulk, grout, and similar residue removal are included only when specifically quoted. High-grade finishes, appliance interiors, cabinet interiors, and specialty fixtures are quoted add-ons, not assumed base scope.
Touch-Up & Punch-List CleaningAfter final cleaning, or whenever punch-list activity, callbacks, or deliveries call for a touch-up pass.
What It Includes
A targeted cleaning pass performed after final cleaning when punch-list corrections, inspections, contractor callbacks, installations, deliveries, or other final activity have reintroduced dust, footprints, fingerprints, residue, or localized mess.
- Localized dust removal
- Floors and traffic areas
- Fingerprints and smudges
- Surfaces disturbed during punch-list work
- Glass touch-ups
- Cleanup following contractor callbacks
- Correction-related residue
- Final presentation detailing
May be scheduled after an LD Turnover final clean, hired as a standalone service, or performed before final walkthrough, occupancy, owner handoff, or reopening. Paint, adhesive, caulk, grout, and other labor-intensive residue removal remain specifically quoted.
Transition CleaningWhenever a space changes use, occupancy, branding, tenancy, or operational state, independent of the standard construction-cleaning sequence.
What It Includes
Detailed cleaning tailored to the condition of the space, which may include surface cleaning, dust and residue removal, glass cleaning, fixture cleaning, and preparation for reopening or handoff.
Common Project Uses
- Retail and store conversions
- Rebranding or reopening of an existing commercial space
- Tenant transitions
- Commercial property transitions
- Office and workplace transitions
- Multifamily units or common areas changing occupancy
- Facilities preparing for a new operational use
Debris & Dust RemovalAs needed, on its own or paired with any other cleaning phase.
What It Includes
Can be offered independently or alongside another cleaning phase to control accumulated construction dust and manageable debris.
- Gathering manageable loose debris
- Bagging and consolidating debris
- Removing packaging and light construction waste associated with cleaning
- Controlling accumulated construction dust
- Placing debris in the project’s existing dumpster or designated disposal area
Not demolition hauling, dumpster service, bulk lumber, drywall, or masonry removal, hazardous-material removal, or unusually heavy material removal.
Low-Level Window & Glass CleaningTypically part of final or touch-up cleaning, or scheduled independently once glass installation is complete.
What It Includes
Primarily an interior-focused service, with manageable exterior glass quoted separately when access and site conditions allow.
- Interior windows
- Reachable exterior windows
- Glass doors
- Storefront glass
- Interior glass partitions
- Tracks and sills
- Fingerprints, labels, dust, and ordinary construction film or residue
Standard launch scope does not include lifts, rope access, high-rise work, or specialty high-access equipment. Exterior glass work remains quote-dependent.
Need Cleaning Support for an Upcoming Project?
Tell us about the project, the cleaning phase or phases you need, and your timing. We'll follow up with pricing and next steps.